![]() Before: One step up from the front walk. One step up and a door sill through doorway. |
![]() After: Concrete poured over the steps to raise the entrance to floor level. Walkway raised/ramped to meet new entrance. Soil added to raise landscaping to walkway level. Storm drainage blocked by walkway - drains added under walkway. |
| Previous Page | Site Map |
Next Page |